Taper x 36 in.
Shower floor pitch.
Creates the proper code required sub floor pitch.
Insures proper pan liner drainage.
Sold 6 per package.
From the floor drain.
If the wall is 3 feet from the drain the cement should rise by 3 4 inches as it goes from the drain to the wall starting at the half inch depth around the drain for a total height of 1 1 4 inches at the wall.
Screws and tape included.
Shower areas with a centered drain or custom shower areas where the drain is within 36 in.
To 1 3 4 in.
Sticks measure 1 8 in.
The mortar bed on top of the membrane is exactly the same thickness along the walls as it is at the drain.
Included in each package is one each center ring and 6 each standard float sticks 1 in.
In order to install a proper shower floor the base of the shower has to have a proper slope for drainage.
Before we begin please understand that in a conventional mortar bed shower floor the slope of the floor comes from the sloped fill or pre slope which is under the shower pan membrane.
Ansi a108 01a section 2 3 6 requires that the mortar.
For standard shower sub floor areas with a centered drain or custom shower areas where the drain is within 36 in.
Our store associates are happy to help you weigh the options and choose the perfect tile for your shower.
If there is significant slope or variation in the level of the floor a smaller tile mosaic will more easily adjust to this shape.
Quick pitch standard kit permits construction of a standard 36 in.
With quick pitch this is easily accomplishable.
Next consider the slope if any of the shower floor.
Length that attach in any of the 24 slots on.
Taper x 36 in.
Quick pitch is a revolutionary new product that will completely change the way in which a mortar bed is installed.