Install step flashing under each pair of hip and ridge slates.
Slate roof installation guide.
Read about the common mistakes people make when installing.
4 have the correct tools.
This gold circle award winning book masterfully renders every design and installation detail to be found in slate roofing.
The association which started in 1922 and was reformed in 2002 spans quarriers contractors architects consultants and distributors with a connection to natural slate.
Alternate solutions to slate roofing problems are provided.
Architects consultants slate installers and designers rave about this book.
Get in touch with us for a fascinating collection of roof slates.
General installation guidelines for natural quarried roofing slate 2 1 8 warranty a.
Slate roofing contractors association of north america inc.
The amount of overhang may be adjusted as needed to achieve the best water flow into the gutter.
Slate can only be installed onto a pitched roof at the minimal level recommended above and depending on the complexity of the structure can take anywhere from one week up to a few weeks or even longer.
Bottom edge of strap folds up to hold pair of slates in place while adhesive sets up.
Companies who are well versed in both british standard 5534 and bs 8000 part 6 will ensure they have the right level of experience to install a natural slate roof.
Installation when laying out a roof in preparation for slating it chalk lines across the entire roof area marking the top edge of every row of slate.
No aluminum drip edges as are commonly used on asphalt shingle roofs are needed on slate roofs when measuring for the starter slate and the first row allow for the slate to hang beyond the drip.
Contractor shall warranty a new slate roof installation covering both material and labor for defects that may occur for a minimum period of five years.
The complete guide for installation of slate roofs is available to download here.
Slate roof installation guide 1 construct the roof properly.
The starter tiles should be placed so the top edge of the starter tile is placed on the line.
All ridge slates should be caulked at joint.
Take a look at the slate tile roof installation guide to gather more detailed information regarding the repair installation of slate roofs.
Assume all elements of the roof assembly must last and function for at least 150 years.
Architectural drawings accurately illustrate flashing and roof lay out.
In this case lifetime caulk.
Proceed up hip with first pair of hip slates cut at an angle to fit against ridge slates.